Business Lines

Installation

Installation2

Installation Scope

  • High Rise Buildings
  • Power Plants
  • Industrial Plants
  • Petrochemical Plants
  • Refineries
  • Fertilizer Plants
  • Pump & Compressor Stations
  • Steel Bridges
  • Storage Tank Farms
  • Piping including Critical and Heavy Wall

Over 780,000 ton installed in total
Structural, Mechanical, Electrical, Piping, Hook up 
In 3 Continents, 15 Countries 

SIGNATURE PROJECTS

02_Makkah-Clock-Tower-2

Makkah Clock Tower, 601 m

K.S.A. SBL Group

03_Naberezhnaya-Tower_

Naberezhnaya Tower, 270 m

Russian Federation, ENKA

04_Eurasia-Tower

Eurasia Tower, 310 m

Russian Federation, ENKA

05_FC-Shaktar-Donetsk-Stadium

Donbass Arena Stadium

Ukraine, ENKA

06_2331MWGebze-Adapazari-2

Gebze - Adapazarı CCPP, 2, 331 MW

Turkey, ENKA

07_1532MWizmir-2

İzmir CCPP, 1, 520 MW

Turkey, ENKA

08_TengizSecondGeneration-2

SECOND GENERATION PROJECT

Kazakhstan, TCO

09_2x140,000-m3-EGEGAZ-LNG

LNG Tank Farm, 2x140,000m3

Turkey, EGEGAZ

010_Spherical-Storage-Tanks-2

Ankara Ereğlisi Spherical Storage Tanks

Turkey, BUTANGAZ

011_770-MW,-Rijnmond-Energy-Center

Rijnmond Energy Center, 770 MW

Netherlands, BECHTEL - ENKA JV

012_411-MW,-Yajva-CCPP

Yajva CCPP, 411 MW

Russian Federation, ENKA

013_WalsumCoalFiredPowerPlant-2

Walsum Coal Fired Power Plant, 800 MW

Germany, HITACHI POWER EUROPE

014_Petkim-Aromatics

Petkim Aromatics

Turkey, PETKIM

halic

Golden Horn Bridge

Turkey, IHI